Additional Content Download

CG Holdings: Substation and components changes

CG Holdings: Substation and components changes

Toon Houwen, Business Development Manager, CG Holdings, presented at last year’s event “66kV for Offshore Wind” on “Substation and components changes”. Read the presentation to find out more.

Info graphic with current 66 kV projects

Info graphic with current 66 kV projects

Find in this infographic a list, as well as the key facts, of the current 66 kV projects in Denmark, Scotland, Portugal, England, and Netherlands. Download the complete graphic here for free:

Developing a 66kV Infrastructure

Developing a 66kV Infrastructure

The transition to 66kV cables, transformers and switchgears has long been touted as a necessary step for the wind industry. Find out in Wind Energy IQ's article "Wind Energy - Developing a 66kV Infrastructure", what Prysmian group, ABB, and Siemens are doing and planning for this topic. Download the complete article here for free:

Interview with TenneT and Boskalis on grid integration, requirements, and testing specification for 66kv

Interview with TenneT and Boskalis on grid integration, requirements, and testing specification for 66kv

Wind Energy IQ talked to Andreas Menze and Jack Watttel about challenges for grid integration, effects of 66kV adoption in the industry, the requirements from a transmission system operator (TSO) perspective, the lack of a clear testing specification, and the extention of 33kV cable manufacturing to 66kv. Read the full interview here for free: