Interview

Interview with TenneT and Boskalis on grid integration, requirements, and testing specification for 66kv

Wind Energy IQ talked to Andreas Menze and Jack Watttel about challenges for grid integration, effects of 66kV adoption in the industry, the requirements from a transmission system operator (TSO) perspective, the lack of a clear testing specification, and the extention of 33kV cable manufacturing to 66kv. Read the full interview here for free: